So we have three projects on the go, project three has been on the back burner for quite awhile. When we bought the caravan we had to dismantle the side gate which as only small to get access to the back yard.

It was always going to be replaced with a wider gate but it had not happened so now it was going to be fixed and repaired. There was no time frame for this. Earlier in the week, Warren stated that he wanted to go to Bunnings to get a post. A post? I asked, yes to fix the fence.

Who am I to argue? if he is going to get on with doing that. Winter is a good time to work outside as summer is far too hot.

I apparently was required to check out the post plus they do nice and cheap coffee. We also bought a pot that we need to get Project two up and running so it was from one end of the store to the other and it is a very big store.

This is the start, the ground is quite hard so the idea as to dig a bit then add water to soften it.


One hole.


Gate is back up with post cemented in and now the side panel is to be a solid piece to fit in between, this was one afternoons work.

Looking good, it is very straight and matches the other gate. Hopefully the side panel will be completed over the weekend.

Then we are going to shift the bricks and get some turf as the lawn has died where the caravan was standing.
Maybe project three will be finished before project one.